Sunday, April 02, 2006

 

Methodology

1. Selection of project location
2. Collecting required data
a) Survey data
b) Hydrologic data
3. Data screening and preparation
4. Preparation of model requirement and configuration
5. Key in necessary data to run the HEC-RAS model
6. HEC-RAS modelling for the simulation of an event for calibration and verification
7. Checking the model accuracy
8. Application of the calibrated HEC-RAS modelling for predicting water surface level for a selected discharge of various ARI
9. Presenting model output
10. Prediction of flood zones and flood depth

Comments: Post a Comment



<< Home

This page is powered by Blogger. Isn't yours?